Assembly, Assembly -11, Track roller required tools - assembly -11 – JLG 600SC_660SJC Service Manual User Manual

Page 115

Advertising
background image

SECTION 6 - UNDERCARRIAGE

3120898

– JLG Lift –

6-11

6.

Remove the o-ring seal from shaft (5). Remove shaft
(5) from roller (6).

7.

Remove Duo-cone seal kit (9) from end collar (8).

8.

Remove spring pin (7) from end collar (8) and shaft
(5). Use a press to remove shaft (5) from end collar
(8). Remove the remaining o-ring seal from shaft (5).

9.

Remove Duo-cone seal kit (10) from each end of the
track roller.

10.

Use a press to remove bearing (11) from each end
of the track roller.

Assembly

1.

Thoroughly clean all parts of the track roller prior to
assembly.

NOTE: Do not reuse bearings (11). Use new parts for

replacement.

2.

Lower the temperature of bearings (11), and install
one in each end of the track roller with a press.
Install the bearings until the bearings make contact
with the counterbore in the track roller.

3.

Use the following procedure to determine the shaft
end play.

Table 6-4. Track Roller Required Tools - Assembly

Tool

Part #

Description

Qty.

A

9U-5985

Seal Installer

1

B

8T-5096

Dial Indicator

1

Advertising