Installation, Installation -56, Tooling (j) -56 – JLG 600SC_660SJC Service Manual User Manual

Page 160: Final drive required tools - installation -56

Advertising
background image

SECTION 6 - UNDERCARRIAGE

6-56

– JLG Lift –

3120898

44.

Use Tooling (B) to compress the brake assembly.
Use Tooling (C) to install the retaining ring.

45.

Install Tooling (J) into the oil supply port (42).

46.

Apply 510 psi (3495 kPa) for a minimum of 3
minuses. If the pressure falls, the piston seals must
be checked.

47.

Install the travel motor on the final drive. Install two
bolts (2).

48.

Fill the final drive with hydraulic oil. The capacity of
the final drive is 2.5 L (.66 US gal). Refer to Opera-
tion and Maintenance Manual, "Lubricant Viscosities
and Refill Capacities" for the correct filling procedure
and the correct level for the final drive.

49.

Install the final drive. Refer to Disassembly and
Assembly, "Final Drive - Install" in this manual.

Installation

1.

Make sure that the mating surfaces of the final drive
and the travel motor are thoroughly clean and free of
dirt and debris.

2.

Install the travel motor on the final drive. Refer to Dis-
assembly and Assembly, "Travel Motor -Install" in
this manual.

Figure 6-13. Tooling (J)

Table 6-21. Final Drive Required Tools - Installation

Tool

Part #

Description

Qty.

A

138-7574

Link Bracket

2

Advertising