Connect, Connect -16, Track link assembly -16 – JLG 600SC_660SJC Service Manual User Manual

Page 120: Track shoe -16, Track required tools - connect -16

Advertising
background image

SECTION 6 - UNDERCARRIAGE

6-16

– JLG Lift –

3120898

PERSONAL INJURY CAN RESULT FROM THE TRACK COMING
OFF OF THE ROLLER FRAME.

THE TRACK CAN MOVE OFF THE TRACK ROLLER FRAME VERY
QUICKLY WHEN A SEPARATION OF THE TRACK IS MADE.

KEEP AWAY FROM THE FRONT OF THE MACHINE WHEN THE
TRACK IS REMOVED FROM THE TRACK ROLLER FRAME.

NOTE: The track bushings will fall out of the track links when

the track assembly is separated.

4.

Remove cotter pin (3) from the master pin. Use a
hammer and a punch to remove the master pin (2)
from the track links. Separate the track links, and
locate the two track bushings. Move the machine
slowly forward until the track assembly is off the
sprocket, the track carrier rollers and the front idler.

5.

Fasten a hoist to the rear of the track. Raise the track
assembly off tooling (A). Remove tooling (A) from
the track assembly. Lower the rear of the track
assembly to the floor.

Connect

Figure 6-6. Track Link Assembly

Table 6-7. Track Required Tools - Connect

Tool

Part #

Description

Qty.

A

1P-3545

Coupling Tool

1

B

1P-3533

Carrier Bar

1

C

1P-7402

Coupling Tool

1

D

5P-6214

Track Block Assembly

1

E

1U-7631

Socket

1

Figure 6-7. Track Shoe

Advertising