Inspection and preventive maintenance schedule -6 – JLG 600SC_660SJC Service Manual User Manual

Page 28

Advertising
background image

SECTION 2 - GENERAL

2-6

– JLG Lift –

3120898

Table 2-3. Inspection and Preventive Maintenance Schedule

AREA

INTERVAL

Pre-Start

1

Inspection

Weekly

Preventive

Maintenance

Monthly

Preventive

Maintenance

Pre-Delivery

2

or Frequent

3

Inspection

Annual

4

(Yearly)

Inspection

Every 2

Years

Boom Assembly

9

Boom Weldments

1,2,4

1,2,4

Hose/Cable Carrier Installations

1,2,9,12

1,2,9,12

Pivot Pins and Pin Retainers

1,2

1,2

Sheaves, Sheave Pins

1,2

1,2

Bearings

1,2

1,2

Wear Pads

1,2

1,2

Covers or Shields

1,2

1,2

Extend/Retract Chain or Cable Systems

1,2,3

1,2,3

Platform Assembly

9

Platform

1,2

1,2

Railing

1,2

1

1,2

Gate

5

1

1,5

Floor

1,2

1

1,2

Rotator

9,5

Lanyard Anchorage Point

2

1,2,10

1,2,10

Turntable Assembly

9

Swing Bearing or Worm Gear

1,2,14

1,2,3,13,14

Oil Coupling

9

Swing Drive System

1,2,14

1,2,3,13,14

Turntable Lock

1,2,5

1,2,5

Hood, Hood Props, Hood Latches

5

1,2,5

Chassis Assembly

9

Drive Motors

1,2

1,2

Torque Hubs

11

11

Functions/Controls

9

Platform Controls

5

5

6

6

Ground Controls

5

5

6

6

Function Control Locks, Guards, or Detents

1,5

1,5

5

5

Footswitch

1,5

5

5

Emergency Stop Switches (Ground & Platform)

5

5

5

Function Limit or Cutout Switch Systems

5

5

Capacity Indicator

5

Drive Brakes

5

Advertising