Installation, 6 articulating jib boom, Removal – JLG 600SC_660SJC Service Manual User Manual

Page 54: Disassembly, Installation -14, Articulating jib boom -14, Removal -14 disassembly -14, Location of components - articulating jib boom -14

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-14

– JLG Lift –

3120898

Installation

1.

Using a suitable lifting device, position boom
assembly on turntable so that the pivot holes in both
boom and turntable are aligned.

2.

Install boom pivot pin, ensuring that location of hole
in pin is aligned with attach point on turntable.

3.

If necessary, gently tap pin into position with soft
headed mallet. Secure pin mounting hardware.

4.

Align push bar pivot hole with pivot holes in turnta-
ble. Install push bar pivot pin, ensuring that location
of hole in pin is aligned with attach point on turnta-
ble.

5.

If necessary, gently tap pin into position with soft
headed mallet. Secure pin mounting hardware.

6.

Connect all wiring to the ground control box.

7.

Connect all hydraulic lines running along side of
boom assembly.

8.

Using all applicable safety precautions, operate lift-
ing device in order to position boom lift cylinder so
that holes in the cylinder rod end and boom struc-
ture are aligned. Insert the lift cylinder pin, ensuring
that location of hole in pin is aligned with attach
point on boom.

9.

Align holes in boom structure with hole in master
cylinder. Insert the master cylinder pin, ensuring that
location of hole in pin is aligned with attach point on
boom.

10.

Adjust retract and extend cables to the proper
torque. Refer to Boom Cable Torque Procedures.

11.

Using all applicable safety precautions, operate
machine systems and raise and extend boom fully,
noting the performance of the extension cycle.

12.

Retract and lower boom, noting the performance of
the retraction cycle.

4.6

ARTICULATING JIB BOOM

Removal

1.

For platform/support removal see platform/support
removal diagram. See Section 4.5, Boom Mainte-
nance
.

2.

Position the articulating jib boom level with ground.

3.

Remove mounting hardware from slave leveling cyl-
inder pin #1. Using a suitable brass drift and ham-
mer, remove the cylinder pin from articulating jib
boom.

4.

Remove mounting hardware from articulating jib
boom pivot pin #2. Using a suitable brass drift and
hammer, remove the pivot pin from boom assembly.

Disassembly

1.

Remove mounting hardware from articulating jib
boom pivot pins #3 and #4. Using a suitable brass
drift and hammer, remove the pins from articulating
jib boom pivot weldment.

2.

Remove mounting hardware from rotator support
pins #5 and #6. Using a suitable brass drift and
hammer, remove the pins from rotator support.

3.

Remove mounting hardware from lift cylinder pin
#7. Using a suitable brass drift and hammer, remove
the cylinder pin from articulating jib boom.

Figure 4-17. Location of Components - Articulating

Jib Boom

Advertising