Test step, 2 pre evacuation – INFICON Sensistor ILS500F Leak Detection System User Manual

Page 42

Advertising
background image

Recipes

42

ninp69e1-a (1410)

Test Step

1

See Connection Step 1 - 3 above and follow the instructions.

7.3.2

Pre Evacuation

Test Step

Tooling Outputs

ON

Condition for starting test

and Tooling Inputs

Info

Delay

1

2

3

4

0.0

Pre Evacuation

Pre Evacuation Setpoint

Extended Pre Evacuation

-0.70

0,0

bar

s

Pre Evacuation Setpoint

A value of -0.70 bar (-0.07 MPa, -10 psi) is
adequate for most applications. This creates 70%
vacuum.

Extended Pre Evacuation

To ensure a complete filling. Evacuation will
continue for the set time after Evacuation Level has
been attained.

Advertising
This manual is related to the following products: