KD Scientific Allegro Peristaltic Pump Series User Manual

Page 21

Advertising
background image

21

Configuring the KDS Allegro Peristaltic Pump System

K

D

S

A

lle

g

ro

P

e

ri

s

ta

lt

ic

P

u

m
p

S

y

s

te

m

U

s

e

r’s

M
a

n

u

a

l

phone

508.429.6809

fax

508.893.0160

e-mail

[email protected]

web

www.kdscientific.com

KD Scientific Allego Peristaltic Pump System User’s Manual

Publication 5613-004-REV-A

Tube Run-In

New tubing or tubing that has been idle for extended

periods should be run-in prior to use. The pump comes

standard with programs to complete this task. Any tube

size that meets the diameter specifications for the

appropriate pump head can be used.

1. From the Mode Selection screen, select the

proper program for the head configuration of

the pump.

Please select program

I_BREAK_IN

for the

Allegro I,

II_BREAK_IN

for the Allegro II or

III_BREAK_IN

for the Allegro III.

2. Once the proper tube break-in program is

selected, the Program Configuration screen

will open.

3. Select the Run button to start the break-in

program. The program run time is 15 minutes.

Tubing Break-In Selections

Select Run to start the

break-in program

NOTE: Large diameter and/or high

durometer tubing require lubrication of

tubing. See Appendix E for ordering

information.

Advertising