Operation – Leica Biosystems ASP200 S User Manual

Page 59

Advertising
background image

59

Leica ASP200 S

Filling with paraffin pellets

5. Operation

Fig. 60

• Fill the paraffin reservoir to the brim (

Fig. 60

, 1)

with paraffin pellets. This corresponds to ap-

prox. 3.5 kg/bath (Leica Histowax pellets).

• Press BACK and REAGENT STATUS to switch

to the status table (

Fig. 59

). Select the filled

wax bath and press the SET AS FULL button.

• After approx. 90 min, add another 0.5 kg of

paraffin pellets.

• Do not insert the baffle plate during the heating

phase.

• The pellets need a total melting time of approx.

10 hours.

1

2

Fig. 59

Important!

The level in a wax bath must NEVER

fall below the mark for minimum level

(

Fig. 60,

2).

• Replace the baffle plate when the paraffin is

melted.

Software control
• After refilling with paraffin pellets, the

ASP200 S does not allow you to run any pro-

grams until the paraffin is completely melted.

The software calculates the amount of time

required for melting the paraffin and does not

start a program until it is sure that the paraffin

will have melted at the time of the first paraffin

cut.

Advertising