6 commissioning, 1 before initial switch-on, Commissioning – Lenze E84DGFCA User Manual
Page 24: Before initial switch-on, 6commissioning
![background image](/manuals/565828/24/background.png)
Commissioning
Before initial switch-on
24
Lenze · Decentralised frequency inverter 8400 motec (AS-Interface option) · EDS84DMOTASI EN 4.0 - 09/2013
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6
Commissioning
During commissioning, system-related data such as motor parameters, operating parameters,
responses, and parameters for fieldbus communication are defined for the drive. For Lenze devices,
this is done via the codes.
The codes of the drive and communication are saved non-volatilely as a data set in the memory
module.
In addition to codes for the configuration, there are codes for diagnosing and monitoring the nodes.
6.1
Before initial switch-on
Stop!
Before you switch on the inverter for the first time, check the entire wiring for
completeness, short circuit, and earth fault.