4 initial switch-on, Initial switch-on, Commissioning – Lenze E84DGFCA User Manual
Page 28
Commissioning
Initial switch-on
28
Lenze · Decentralised frequency inverter 8400 motec (AS-Interface option) · EDS84DMOTASI EN 4.0 - 09/2013
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6.4
Initial switch-on
Establishing communication
• To establish a communication, the Inverter Drive must be supplied with mains voltage.
• For AS-i communication, the Communication Unit has to be supplied with voltage. If this is not
the case, the error message "CE04: MCI communication error" (error no. 01.0127.00002) is
output.
via the AS-i bus cable serves to maintain the AS-i communication in
case of a main supply failure.
• During mains connection, all parameters (codes) are read.
• Addressing can be carried out automatically via the master, an external addressing unit or
manually via codes in the »Engineer«.