Operation timing of sequence control signals – Rockwell Automation 8720MC 8720MC Regenerative Power Supply User Manual User Manual

Page 71

Advertising
background image

Figure 4.13
Sequence Operation of Discharging

Operation Timing of Sequence Control Signals

Figures 4.12 through 4.17 show timing of various sequence control
signal operations.

Figure 4.12
Sequence Operation of Precharging

On
Off

On
Off

On
Off

Open
Close

Open
Close

Open
Close

RST Input

RDY Output

FR Output

IP Output

DC Bus Voltage

Main Magnetic

Contactor (MC)

PWR Input

On
Off

On
Off

On
Off

Open
Close

Open
Close

Open
Close

DC Bus Voltage

Main Magnetic

Contactor (MC)

PWR Input

RST Input

RDY Output

FR Output

IP Output

4-33

Wiring

Advertising