Seed/fertilizer hose port maps, Primary hose routing (all spacings), Primary hose, double-shoot – Great Plains NTA2007HD Predelivery Manual User Manual

Page 100: Primary hose, dual-hopper, single-shoot, Primary hose, single-hopper

Advertising
background image

96

Great Plains Manufacturing, Inc.

Contents

Index

NTA607HD

166-283Q

Contents

Index

02/09/2011

Seed/Fertilizer Hose Port Maps

Primary Hose Routing (all spacings)

Primary Hose Routing (from meter outlet or Y-tube to
towers, varies by hopper configurations, but is same for
all row spacings).

Illustrations at right show meter outlets (top) and portals
at front of implement center frame.

Left/Right is facing in the direction of drill travel (forward).

Note: Hoses G and F will cross each other under the rear

of the implement frame, in order to reach their re-
spective towers. This is normal.

Primary Hose, Double-Shoot

Null4.aac:

Primary Hose, Dual-Hopper, Single-Shoot

Null4.aac:

Primary Hose, Single-Hopper

Null4.aac:

B
A

C
D

G

B

A

E

C

F

H

D

I

II

1

1

2

3

4

2

3

4

B

D

A

C

G

H

E

F

Single-Shoot

Double-Shoot

Hopper

Meter

Primary Hose Length*

Link Routing

Implement

Distribution

Number

Outlet

Metric

Inches

Portal

Position

Section

Tower

I

1 (B)

437 cm

172 in.

Left

Upper-R

Center

B

I

2 (A)

602 cm

237 in.

Left

Lower-L

Left

A

I

3 (D)

709 cm

279 in.

Right

Lower-R

Right

D

I

4 (C)

437 cm

172 in.

Right

Upper-L

Center

C

II

1 (G)

528 cm

208 in.

Left

Upper-L

Center

G

II

2 (E)

602 cm

237 in.

Left

Lower-R

Left

E

II

3 (H)

709 cm

279 in.

Right

Lower-L

Right

H

II

4 (F)

528 cm

208 in.

Right

Upper-R

Center

F

* Hose length may be shortened a few cm/in after checking slack and clearances during lift and fold.

Hopper

Meter

Primary Hose Length*

Link Routing

Implement

Distribution

Number

Outlet

Metric

Inches

Portal

Position

Section

Tower

I + II

1 (B)

376 cm

148 in.

Left

Upper

Center

B

I + II

2 (A)

541 cm

213 in.

Left

Lower

Left

A

I + II

3 (D)

648 cm

255 in.

Right

Lower

Right

D

I + II

4 (C)

376 cm

148 in.

Right

Upper

Center

C

* Hose length may be shortened a few cm/in after checking slack and clearances during lift and fold.

Hopper

Meter

Primary Hose Length*

Link Routing

Implement

Distribution

Number

Outlet

Metric

Inches

Portal

Position

Section

Tower

I

1 (B)

406 cm

160 in.

Left

Upper

Center

B

I

2 (A)

572 cm

225 in.

Left

Lower

Left

A

I

3 (D)

678 cm

267 in.

Right

Lower

Right

D

I

4 (C)

406 cm

160 in.

Right

Upper

Center

C

* Hose length may be shortened a few cm/in after checking slack and clearances during lift and fold.

Advertising
This manual is related to the following products: