Install center section harnesses, Route lighting harness, Fb l r – Great Plains NTA2007HD Predelivery Manual User Manual

Page 65

Advertising
background image

Great Plains Manufacturing, Inc.

Contents

Index

Implement Assembly

61

02/09/2011

Contents

Index

166-283Q

Install Center Section Harnesses

The monitor, lift switch and lighting harness segments
run from the cart to various elements on the center sec-
tion. It is recommended that the center section harness
segments be routed prior to weight installation, even
though towers, WSMBs, sensors, switch and lights are
not yet installed (some center harness segments run
under weights).

Route Lighting Harness

Refer to Figure 106 and Figure 107
255. Select one:

833-521C LIGHT HARNESS EU NTA607 IMPLMT

Mate the Deutsch connector end of implement
harness

to the receptacle

at the cart bulk-

head.

Allowing 25cm (10in) slack, route harness
through the top front clip of hitch front clamp

.

Route harness

through the top left clip of mid-

hitch clamp

.

Allowing 25cm (10in) slack, route harness
through the bottom right clip of left hitch portal
clamp

.

Refer to Figure 107
256. Route harness

through cable clips

on left

inside face of center section frame tubes and left
side of the rear lower parallel arm weldment.

Leave a few cm/in of slack in the cable at the front
and rear parallel arm pivots.

Null4:

Null4:

Figure 106

Cart-Implement Lighting Connection

Q0074

287

286

287

287

286

287

C01

Null4:

Figure 107

Route Lighting Harness

Q0068

Facing Rear

Facing Right

C02

C01

C03

C04

287

287

287

Facing Rear

Facing Rear

U

D

F

B

L

R

287

C02

287

C04

287

1

1

1

1

F

B

L

R

1

1

Null4:

Figure 108

Center Section Lighting Route

Q0075

Advertising
This manual is related to the following products: