Cart fertilizer plumbing (option) – Great Plains NTA2007HD Predelivery Manual User Manual

Page 32

Advertising
background image

28

Great Plains Manufacturing, Inc.

Contents

Index

NTA607HD

166-283Q

Contents

Index

02/09/2011

Cart Fertilizer Plumbing (option)

If the drill was not ordered with the liquid fertilizer option
(feature code 71), skip step L1 through step L22.

Incomplete Assembly Data:
This section is a placeholder. At publication time, export status
for the single 82 bushel/dual 200 gallon cart configuration was
not fully documented. The instructions below are an estimated
outline of steps.

Assumptions:

• Pump pre-installed on cart frame.

Inlet and outlet capped.
Drive chains pre-installed.

• Pump adjuster tool in crate (might fall out of holder

during shipment).

• No other plumbing on cart frame, hopper frame, or

implement.

• No hoses cut to length.

• Rigid plumbing/fittings pre-assembled, in 10 groups:

1. left tank, pump tee, pump s/o, strainer, el
2. mid-cart tee & el
3. right tank el & shutoff
4. quick-fill & shut-off
5. shut-off & outlet to implement
6. manifold pressure & dump valve
7. implement QD
8. implement center tee & elbows
9. (2) wing tees
10. section booms

Null4:

Figure 41

Cart Fertilizer Plumbing

31372

Advertising
This manual is related to the following products: