Connect primary hoses to towers – Great Plains NTA2007HD Predelivery Manual User Manual

Page 83

Advertising
background image

Great Plains Manufacturing, Inc.

Contents

Index

Implement Assembly

79

02/09/2011

Contents

Index

166-283Q

Connect Primary Hoses to Towers

316. Select two or four (double-shoot)

800-180C 2 1/2 AIR HOSE BAND CLAMP

Slide a clamp onto center section primary hoses
A&B (and F&G for double-shoot).

Slide the hoses onto their respective tower inlets for
a distance of about 5cm (2in). Position the clamps
about 2.5cm (1in) from the end of the hose and
secure. Tighten clamps only enough to prevent
hoses from working loose. be careful not to crush
hose.

317. Adjust vertical position of base towers so that top of

hose at inlets is in gentle contact with drill frame or
tower mount. Secure U-bolts to hold this position.
Do not over-tighten.

Refer to Figure 143 (which depicts the right wing at a later
stage of assembly)

318. Route wing primary hoses:

A (and E) to left wing
D (and H) to right wing
under center frame and through hoops

on rear

face of wing tubes, then out to tower mounts.

Note: Hoses G and F will cross each other to reach their

respective towers. This is normal.

319. Select two or four (double-shoot)

800-180C 2 1/2 AIR HOSE BAND CLAMP

Slide a clamp onto the free end of each primary
hose.

Slide the hoses onto to their respective tower inlets
for a distance of about 5cm (2in). Position the
clamps about 2.5cm (1in) from the end of the hose
and secure. Tighten clamps only enough to prevent
hoses from working loose. be careful not to crush
hose.

Null4:

Null4:

Figure 143

Primary Hose to Towers

Q0062

1

176

1

176

Advertising
This manual is related to the following products: