Drill Test

Complete this section before installing Options (if any).

Initialize Monitor

375. Make a monitor connection per Operator manual

and DICKEY-john

®

ACC manuals.

Note: An operator monitor system is required to operate

the fold-enable solenoid valves.

376. Run a system configuration, and allow the monitor

to detect and configure all CANbus modules. If the
WSMBs were correctly installed in serial-number
order, the default row assignments should require
no changes.

Diagnose and correct any faults or alarms.

377. Bleed lift hydraulics per the Operator manual.

378. Test the Lift function.

379. Adjust Lift Switch per Operator manual.

380. Bleed Fold/Transfer hydraulics per Operator man-

ual.

381. Test Lift Lock

382. Test Fold

383. Pre-set weight transfer valves per the Operator

manual, Appendix B.

384. Adjust hose lengths.