Install walkboard railing, Remove pressure gauge bracket – Great Plains NTA2007HD Predelivery Manual User Manual

Page 19

Advertising
background image

Great Plains Manufacturing, Inc.

Contents

Index

Cart Assembly

15

02/09/2011

Contents

Index

166-283Q

Install Walkboard Railing

Refer to Figure 20 (depicting a dual-hopper bracket asy.)
If the manifold pressure gauge bracket

is not

installed, skip to “Install Walkboard Extension” on
page 17.

Remove Pressure Gauge Bracket
27. Loosen clamps:

800-126C CLAMP WRM DRV #5 SS (.44-.70)

and disconnect sense line tubing:

990-080R HOSE 3/8 ID 150PSI EPDM

Save the clamps. Prevent hose(s) from touching
ground. Do not disconnect hoses at manifold.

28. Remove and save two sets:

803-014C NUT HEX 3/8-16 PLT

804-013C WASHER LOCK SPRING 3/8 PLT

804-011C WASHER FLAT 3/8 USS PLT

802-079C HHCS 3/8-16X1 1/4 GR5

then remove and carefully save the bracket
assembly

. Do not remove the gauges.

186

145

205

224

223

307

180

Null4:

Figure 20

Gauge Bracket Dismount

Q0017

145

180

307

205
224
223
186

145

Advertising
This manual is related to the following products: