Assemble lock cylinder valve, Install lock cylinder valve – Great Plains NTA2007HD Predelivery Manual User Manual

Page 51

Advertising
background image

Great Plains Manufacturing, Inc.

Contents

Index

Implement Assembly

47

02/09/2011

Contents

Index

166-283Q

Assemble Lock Cylinder Valve
If the fittings are pre-assembled on the valve, review the
Figure for Port ID and orientation, then skip to step 181.

See page 95 for JIC and ORB torque.

Refer to Figure 77
178. Select one each:

810-428C VALVE PO CHECK 4:1 W/9/16FORB

811-627C AD 9/16MORB 9/16FJIC

811-581C CR 9/16MJIC

and two:

811-065C EL 9/16MJIC 9/16MORB

Orientation:
Port

: front

Port

: rear

Port

: top

179. Install one elbow

at port

, JIC end to left.

Install one elbow

at port

, JIC end down.

Install the adaptor

at port

.

180. Add the cross

to the adaptor

, with side

ports facing front and rear.

Null4:

Install Lock Cylinder Valve
Note: This installation places the label side of the POC

valve against the lug.

Refer to Figure 78
181. Select two sets:

802-804C HHCS 1/4-20X2 3/4 GR8 PLT

804-006C WASHER LOCK SPRING 1/4 PLT

803-006C NUT HEX 1/4-20 PLT

and four:

804-075C WASHER FLAT 1/4 USS PLT

With port

to the front, and port

up, mount the

POC valve assembly

on the right side of the

lock cylinder base lug

. Bring nuts only to snug, as

you may prefer to remove the valve later for hose
installation.

Null4:

Null4:

Figure 77

Lock Cylinder Valve Assembly

Q0054

260

262

273

275

262

1

2

3

U

D

F

B

L

R

260
275
273

262

1
2
3

262

1

262

2

275

3

273

275

Null4:

Figure 78

Install Lock Cylinder Valve

Q0054

260

200

235

203

1

3

U

D

F

B

L

R

220

235

4

200
220
203

235

1

3

260

4

Advertising
This manual is related to the following products: