ADS Environmental Services ADS TRITON+ QR 775027 A3 User Manual

Page 338

Advertising
background image

Maintenance and Troubleshooting 10-17

14. Finger-tighten the top bolts to make sure the top and gasket are

seated properly. Then, tighten the bolts about halfway to full
torque value by tightening the opposite bolts. Finally, tighten
the bolts to approximately 30 inch-pounds (2.50 foot-pounds/
3.39 Nm
) to fully secure the top to the canister. If the monitor
will not seal, loosen the bolts and check for a trapped wire or
debris on either the gasket or the lip. You can increase the
torque value on the bolts incrementally to assist in sealing.
However, tighten the bolts evenly to prevent distorting the
gasket and do not exceed 45-inch pounds (5.0843Nm).

15. Place the monitor upright on the ground surface beside the

manhole, and reconnect the antenna cable to the ANTENNA
port on the monitor.

16. Check the new battery voltage by activating the diagnostic

codes in the LED STATUS window on the monitor using the
red magnet. The internal voltage should now be well above 7.5
volts. Refer to Activating and Reading the Diagnostic Codes
on page 10-5 for instructions on initiating and interpreting the
codes.

17. Wrap rubber stretch tape around the entire antenna

cable/ANTENNA port connection, extending 1 to 2 inches
onto the cable beyond the connection.

COAXIAL STRETCH TAPE

ANTENNA CABLE

TRITON+ MONITOR

ANTENNA PORT

Antenna cable connected to ANTENNA port on monitor with stretch tape

properly applied

18. Reconnect the sensor cable(s) to the appropriate port(s)

(Channel 1 and/or Channel 2) on the monitor.

Advertising