4.10 Installing the Server into a Rack

Several different rack mounting kits are available, depending on whether you need 2-post or 4-post
mounting and whether you need 19-inch or 23-inch rack widths. Also available are a basic slide rail kit
and a rail enabling kit. For detailed information about the rack mounting kits and how to order them, see
the CG1200 Carrier Grade Server Configuration Guide. The latest version of the Configuration Guide is
located on the Kontron support website at

http://us.kontron.com/support/

(search for CG1200, click on

Product Downloads, then Ordering Guide).

NOTE: This equipment should be installed and serviced in a restricted access area by trained technical
personnel. The knurled thumbscrew must be tightened with a #2 Philips head screwdriver after
installation of the top cover.

Installation instructions are included in each of the rack mounting kits.

4.10.1 Connecting the Power Cord

NOTE: When using a rack, wait to install the power cord(s) until after the server is in the rack.

4.10.2 Tools and Supplies Needed

#1 and #2 Phillips (cross-point) screwdrivers (or interchangeable tip screwdriver with #1 and #2