Kontron CG1200 Carrier Grade Server Installation and Maintenance Guide 82

3. Fasten the server board to the chassis base with the seven screws that were removed and saved.

4. If the new server board does not have components pre-installed and you are re-using components

from the old server board, install components as follows:

To install memory DIMMs, see Section 3.3.3, “ Installing Memory DIMMs”.

To install heat sink(s) and processor(s), see Section 3.3.5, “Adding or Replacing a Processor”

5. Re-install all cables disconnected when the old server board was removed:

- Baseboard SSI main power cable from the power distribution board
- CPU1 and DIMM power cable from the power distribution board
- CPU2 and DIMM power cable from the power distribution board
- PMBus signal cable
- Baseboard SSI power control signal cable
- Front panel board USB cable
- SSI front panel board cable
- Fan set power cables (5)
- Mini-SAS cable from the SAS HDD backplane (if not connected to a hardware RAID controller)
- HSBP I

2

C/HDD LED cable from the SAS backplane

6. Re-install the RMM4 module or RMM4Lite, if used. For instructions, see Section 4.7, “Installing a

Remote Management Module 4”.

7. Re-install the I/O module, if used. For instructions, see Section 4.8, “Installing an I/O Module”.

8. Re-install the hardware RAID ROC module, if used. For instructions, see Section 4.3 “Installing a

Hardware RAID Controller”.

9. Re-install the riser card assembly. For instructions, see Section 3.2.6, “ Re-Installing the Riser Card

Assembly”.

10. Re-connect the TAM alarms cable to the alarms connector on the chassis rear panel. See Figure 6:

CG1200 Server Rear View”.

11. If this is the last task you are performing inside the server chassis, replace the chassis cover and

reconnect any external devices and the power cord(s).