Kontron CG1200 Carrier Grade Server User Manual

Page 87

Advertising
background image


81

Kontron CG1200 Carrier Grade Server Installation and Maintenance Guide 81

Figure 63: Removing the Server Board

5.8.2 Installing the New Server Board

1. Set the replacement server board in place.

Insert the rear edge of the board first and line up the I/O ports with the slots in the rear panel of the
chassis.

2. Make sure all three self-aligning standoffs go through the holes at the front of the board.

NOTE: If the standoffs are misaligned when the board is screwed down the holes will be damaged and
the standoffs may be cross-threaded.

Advertising