Interlogix UltraView IP PTZ 36X Camera User Manual User Manual

Page 12

Advertising
background image

Chapter 2: Installation

8

UltraView IP PTZ 36X Camera User Manual

8. Connect the cables.

 Connect the crimp-on BNC connector of the video output to the coaxial

video cable of a monitor (optional).

 Connect the Ethernet cable to a network.

 Connect the power cable to the power source.

Warning: After installation, the PTZ module will perform a PTZ self-test and
initializes with the power on. DO NOT touch and move the camera while it is
self-testing and initializing.

9. Configure the dome camera to suit its location.

To install the flush-mount cameras:

1. Prepare the mounting surface.

On the false ceiling, mark the position and size of the housing pass-through
hole. The size of the cutout must be between Ø192 mm Ø 194 mm. Cut out
the hole. Make sure the facility cables (Ethernet and power, and, if used,
alarm, relay, audio, and analog video) for the dome are prepared.

Note: The mounting surface must be capable of supporting at least 5 kg
(11 lb.).

2. Unscrew the bubble from the camera and remove the protective tape from the

PTZ module.

3. Press the two housing tabs on either side of the PTZ module and remove the

module from the camera housing. Ensure the module cables still exit from the
cable entry hole in the top of the housing.

Note: If alarm and audio input/output relays are to be used, connect them to
the PCB of the module and route their cables through the cable entry hole on
tom of the housing. See “Connections” on page 11 for further information on
the alarm connections.

4. Install the housing.

Adjust the height of the two housing tabs by turning the screw on which they
are attached. The distance (h) of the tabs from the housing ring must be
greater than the thickness of the ceiling.

Housing tab

Screw

Advertising