LAARS NeoTherm NTV1000 - Install and Operating Manual User Manual

Page 62

Advertising
background image

LAARS Heating Systems

Page 58

2. In a running system, the following screen

would normally show the current activity of

each unit in the Lead/Lag system. See Fig. 58.

fig. 58 – lead/lag Screen

3. To set up the Lead/Lag Master function, press

the button for Lead Lag Master. Fig. 59 shows

the screen that follows.

fig. 59 – lead/lag master Screen

4. Press the Configure button. The display will

present the Lead/Lag Master Configuration

Screen (Fig. 60).

Fig. 60 – Lead/Lag Master Configuration

5. This screen shows the most important settings

for the Lead/Lag system. The settings can be

changed from this screen. Some of them will

require passwords.

We will enter all of the Lead/Lag control

values in a moment. For now, just press on the

line for Master Enable. Change the setting to

Enable.

Press the Home button to go back to the Home

screen.

Job D - Disable the lead/lag master

function on the lead/lag Slaves

(This is an individual function – do this for each of the controls,
except the one used as the Lead/Lag Master. Use the separate
Operator Interface on each boiler.)

At the beginning of this section, we described the

Master and Slave arrangement used with the Lead/

Lag system. In the previous section, we explained

how to set up one controller as the Lead/Lag Master.

As we said, the controller used as the Master (usually

the Primary controller for Boiler 1) also serves as a

Slave (usually Slave 1). A single controller performs

both functions.
When the controllers arrive from the Laars factory,

they will all be configured as slaves. Your job in this

step is to disable the Lead/Lag Master function on

each of the controls, except for the one control that

will be used as the Lead/Lag Master – usually the

Primary control on Boiler 1.

Advertising
This manual is related to the following products: