8. Press the Change Address button again. The

system will present a screen that lets you

change the address.

fig. 68 – Changing modbus address

9. Table 13 shows how the Modbus control

addressing should be set up. The system is

simple, but it is important to only use the

correct address listed in the table. Do not use

any other address than the one listed in the

table for the control you are addressing. In this

example, the correct address for the Primary

Control on Boiler 1 is “1.” If this is not already

set to “1”, enter the correct number, then press

OK.

Boiler 1

Boiler 2

Boiler 3

Boiler 4

Primary control

1

3

5

7

Secondary control

2

4

6

8

table 13 – modbus Control addressing

WarnInG

If the addresses are not assigned properly, the

system could fail to operate correctly, or it might

operate in an unsafe manner. This could lead to

property damage, personal injury or death.

10. Now you can use the same process to set the

address for the Secondary control for Boiler 1.

On the Modbus System Configuration screen

(Fig. 67), press the second line – Boiler 1

Secondary. Change the address to the correct

address taken from Table 3. In this case, the

correct address would be “2.”

11. Go to the Operator Interface for Boiler 2.

Repeat the process to change the addresses for

Boiler 2 Primary (address = 3) and Boiler 2

Secondary (address = 4).

12. Repeat steps 3 - 10 for each of the other

controllers connected to the system.

Job f - Set the flap Valve IDs

(These are individual functions. Make the flap valve assignment
on each of the controllers. Use the Operator Interface on each of
the boilers.)

Do this on any system with multiple boilers.
Each boiler includes two burners, and each burner

has a flap valve. See Fig. 69.

Primary
burner

Primary
controller

Flap
valve

Flap
valve

Secondary
controller

Secondary
burner

Operator
interface

Boiler 1

fig. 69 - flap Valve arrangement