COMMISSIONING CHECK LIST

G

ENERAL

†

All equipment ordered by the customer is installed.

†

The unit is level and secure.

†

The mains and control wiring are complete and the circuit breaker and GPO are turned ON.

†

All Controller functions for the appliance operate.

†

All electrical or gas connections are to manufacturers specifications and the relevant electrical or gas
standards and codes.


D

UCTED

E

VAPORATIVE

A

IR

C

ONDITIONER UNIT

†

The water supply line has been flushed to clear swarf and debris and is free of leaks.

†

The tank is free of foreign matter and debris and the water isolating tap is turned ON.

†

Water drainpipe work is completed and sealed.

†

The water basin fills with water and the float valve closes correctly when the water level is 65-70mm
below the overflow level.

†

The water pump operates correctly when turned ON at the controller.

†

The Dialflo water bleed rate is adjusted to suit local water conditions.

†

The Superclean Dump Valve (option). The tank drains correctly when unit turns off.

†

The fan deck is correctly located and the fan blade spins freely.

†

The fan operates through the entire speed range.

†

The minimum fan speed is correctly set.

†

Water distribution is even with the filter pads fitted and the air conditioner operating pump and fan.

D

UCTED

H

EATING UNIT

†

Electrical polarity of the power outlet is correct.

†

Heater is installed away from sources of dust and fumes (i.e. pool chlorine/petrol etc).

†

Gas leaks checked for, none present.

†

Flue outlet pipe complies with limits given / code and is sealed waterproof.

†

Combustion air meets requirements (internal, under floor).