Add-on refrigerated air conditioning unit, Ductwork, Site – Bonaire Comfort Control - RF/LV User Manual

Page 46: Customer hand over

Advertising
background image

Multi-Appliance Comfort Control


Controls- Installation / Setup / Commissioning

†

Fan speed set is correct.

†

Burner pressure is correct.

†

Mounting pad/platform complies with requirements / codes.


A

DD

-

ON

R

EFRIGERATED

A

IR

C

ONDITIONING UNIT

†

Unit Foundation correct

†

All pipe work is welded and vacuumed down.

†

Condenser Coil is purged before charging.

†

System is charged, all joints checked and pressures set correctly

†

Condenser unit is level

†

All clearances around the condenser set to manufacturer’s specifications.

D

UCTWORK

†

All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5 x the
ductwork diameter.

†

Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.

†

All roof penetrations are fully sealed and watertight.

†

Manhole cover replaced.


S

ITE

†

All rubbish has been removed from inside and on the roof.


C

USTOMER

H

AND

O

VER

†

The operation of the Controller.

†

The need to open windows and doors for the correct operation of Fresh Air Conditioning

†

The operation of the bleed or dumping system and it’s importance to operate all the time in ducted
fresh air conditioning

†

Maintenance requirements

Comfort Control - PNE

Page 46

Advertising