Setting up a basic link – KBC Networks WESII User Manual
Page 32
Advertising
![background image](/files/769412/content/doc032.png)
WESII User Manual
Manual-WESII-Rev1403
Copyright © KBC Networks 2014
Page 31 of 140
www.kbcnetworks.com
9. Setting up a basic link
It is highly recommended that all equipment be bench tested before being installed on
site.
You will need:
4 x straight through Ethernet cables.
Note:
It is recommended that for bench testing Host and Client units be placed face
downwards with a distance of 5 – 10m between them to avoid saturation.
The following sections deal with setting up basic links for the three different firmware
versions:
•
US & Canada
•
EMEA
•
Australian
Advertising