Installation for switch test – Xtramus NuStreams-P6GW V1.0 User Manual

Page 14

Advertising
background image


14

E-mail: [email protected]

Website: www.Xtramus.com

XTRAMUS TECHNOLOGIES

®

3.2. Installation for Switch Test

While performing tests on Switch, DUT LAN ports must be connected to NuStreams-P6GW with CAT-5

UTP cables or/and the DUT must detects the NuStreams-P6GW’s signal from its Wireless Module as

shown in the figure down below:

If both NuStreams-P6GW’s Switch Port 1~5 and DUT’s ports are connected via CAT-5 UTP cables

correctly, the Link/ACT LEDs 1~5 located on NuStreams-P6GW’s LAN Port Status LED will be ON

accordingly. If both Nustreams-P6GW and DUT are connected via Wireless connection, the last

Link/ACT LED (WLAN) will be ON accordingly.

Advertising
This manual is related to the following products: