Starting dut tests with nupad – Xtramus NuStreams-P6GW V1.0 User Manual

Page 77

Advertising
background image


77

E-mail: [email protected]

Website: www.Xtramus.com

XTRAMUS TECHNOLOGIES

®

6.3. Starting DUT Tests with NuPAD

NuPAD has 3 buttons on its front panel: “|| Pause”, “■ Stop”, and “

Run”. After connecting NuPAD

with NuStreams-P6GW with Cat-5 cable, you can start/pause/stop DUT tests with these 3 buttons.

Please see the table down below for a detailed description about these buttons’ functions.

Function

Button

Description

Start Testing All

Tasks in Current Run

► Run

Press “

► Run” to start all Tasks

in the current Run. The current
Run (Run 1~3) about to be
tested will be displayed on the
upper-right part of LCD.

Switching Current

Run

|| Pause

+

■Stop

To change the current Run (Run 1~3), press both “|| Pause” and

■Stop” buttons at the same time. If NuPAD is current in Run 1,

pressing both “|| Pause” and “

■Stop” buttons at the same time will

switch the current Run from Run 1 to Run 2.

Pause Current

Running Test

|| Pause

Press “|| Pause” button once to pause the current running test.
Press “|| Pause” button again to resume the test.

Stop Current

Running Test

■Stop

Press “

■Stop” button once to stop the current running test.

Advertising
This manual is related to the following products: