Checkstand preparation, Checkstand preparation -11, Titled – Datalogic Scanning 9500 User Manual

Page 39: Detail steps for, Controller box eas service connection

Advertising
background image

Checkstand Preparation

Product Reference Guide

2-11

Checkstand Preparation

Reference

Figure 2-5

. When performing a first time installation into a

new checkstand, verify before cutting that room will be allowed for
cabling, the AC/DC Power Supply, and the Sensormatic

®

Controller Box.

When making the opening, take extra care to accurately cut to the correct
dimensions. Mounting may require installation of support(s), countertop
routing, or other such devices. Depending upon checkstand design, you
may wish to install an item diverter to direct items toward the scan win-
dow. See the instructions in this manual titled “Counter Cutout” for more
details concerning the location and preparation of the opening.

Figure 2-5. Installation Overview

Item Diverter

Cable Routing

Groove

Connector

Bulkhead

AC/DC Power

Supply

Sensormatic

®

Controller Box

EAS Service

Connection

POS Te

rmina

l

Rem

ote Di

splay

Aux.

Port

EAS Po

rt

Power

Scale Host

0.00

Advertising
This manual is related to the following products: