Comtech EF Data HPOD User Manual

Page 133

Advertising
background image

HPOD C-, X-, Ku-Band High-Power Outdoor Amplifier

MN/HPOD.IOM

Appendix B

Revision 8

B–3

While the BU is constantly monitoring both units for their status, if either has a fault, use the last

(good) status as the configuration for the BU before the BU goes online. Once the BU goes

online, the redundancy auto/manual status reverts to manual mode, and the BU stays online

until reset by the user.

The user may reset the system by issuing a FBU=0 command to place the units back into auto

mode. When issuing this command, the BU then switches back to the “normal” configuration of

SSPAs 1 and 2 online. The system can be operated manually by sending an FBU=1 command

(which forces SSPA 1 to be backed up), or a FBU=2 command (which forces SSPA 2 to be backed

up) to the BU.

In 1:2 applications, the BU also stores an offset value, to be used when the BU replaces an active

unit, for each of the two online units. This offset may be set with the SBO= command. When an

online unit is being “backed up” the BU’s attenuator will be set to this value. This value may be

different than the attenuation value of the online unit to compensate for any gain mismatch

between the BU and online units.

To calibrate, do these steps:

Step

Task

1

After proper operating levels have been established in online SSPA 1 and 2, store their attenuation settings

using the SBO= command in the backup unit.

For example – SSPA 1, the active SSPA, requires 15.00 dB of attenuation. SSPA 2, the BU unit, requires

10.00 dB: Enter the remote commands SBO=1,15.00 and SBO=2,10.00 to store these values.

2

Send the FBU=1 command to the BU unit. This will force the BU unit to replace SSPA 1. The BU unit will

read the setting stored by the SBO=1 command (in this example, 15.00) and apply this value to its own

attenuation setting. This value can now be tuned to compensate for any gain mismatch.

For example – If the output power is 1 dB too high in this state, send ATT=16.00 to the BU unit. If the Tx

level is now correct, send SBO=1,16.00 to the BU unit.

3

Repeat the above process to achieve desired level matching and for SSPA 2.

Advertising