C.4 scheduled maintenance – Comtech EF Data HPOD User Manual

Page 148

Advertising
background image

HPOD C-, X-, Ku-Band High-Power Outdoor Amplifier

MN/HPOD.IOM

Appendix C

Revision 8

C–6

C.4

Scheduled Maintenance

The SSPA heat sink should be cleaned once a year or sooner, depending on

environmental conditions.

To perform this maintenance, do these steps:

Step

Task

1

Disconnect the HPOD SSPA from its power source.

2

Remove the power supply as instructed in Sect. C.2.1.

3

Remove the fan assembly as instructed in Sect. C.3.1.

4

Use compressed air to clear the heat sink portions of the power supply.

5

Use compressed air to blow through the SSPA heat sink to remove any foreign object accumulation

that may be obstructing airflow.

6

Re-install the power supply as instructed in Sect. C.2.2.

7

Re-install the fan assembly as instructed in Sect. C.3.2.

8

Reconnect the HPOD SSPA to its power source.

Advertising