2 installation and removal of smt controls, 1 installation – Flowserve MX-85 Actuator User Manual

Page 64

Advertising
background image

Flow Control

Limitorque Actuation Systems

56

MX-85/140 Maintenance and Spare Parts

FCD LMAIM1341-00

5.2 Installation and Removal of SMT Controls

5.2.1 Installation

STEP 1

a

CAUTION: Ensure the voltage jumper on power
board is located in the proper slot for the
nameplate and motor voltage! Follow the tem-
plate provided on the Mylar protection barrier
for proper voltage jumper location.

a

CAUTION: Potential to cause electrostatic
damage to electronic components. Before
handling electronic components, ensure that
you are discharged of static electricity by briefly
touching a grounded metal object. Flowserve
recommends the use of a wrist strap grounded
to an appropriate ground.

1

STEP 2 (IF NECESSARY)

Attach the SMT Terminal Block conversion wiring
harness (P/N 64-825-0010-4) to the existing
through hole wiring harness. Connect each through
hole Molex connector to its corresponding SMT
Molex connector.

STEP 3

Install tie wrap on the mated 20 pin Molex connec-
tor pair so that they cannot be separated.

STEP 4

Connect the 6-pin Molex wire harness to plug P2
and 16-pin Molex harness to plug P3, and the 20
pin Molex wire harness to plug P4 on Power board.

4

Advertising
This manual is related to the following products: