Powering on the switch – H3C Technologies H3C S12500 Series Switches User Manual

Page 64

Advertising
background image

54

Powering on the switch

IMPORTANT:

Before powering on the switch, identify the power switch in the equipment room so that you can disconnect
the power supply promptly in case of an emergency.

Before powering on the switch, verify that:

The interface cables, power cords, and the grounding cable are correctly connected.

The input power voltage meets the requirement of the switch.

The console cable is properly connected, the terminal or PC used for configuration has started, and
the configuration parameters have been set.

Powering on the switch

1.

Turn on the power switch of the power source providing power to the switch.

2.

Turn on the power switch on the switch.

Before the switch is powered on, the basic manufacturing information about the switch is displayed:

DDR2 SDRAM test successful.

System is starting...

Booting Normal Extend BootWare

The Extend BootWare is self-decompressing

Done!

**************************************************************************

* *

* H3C S12500 BootWare, Version 1.09 *

* *

**************************************************************************

Copyright (c) 2004-2009 Hangzhou H3C Technologies Co., Ltd.

Compiled Date : Jul 22 2009

CPU Type : MPC8548E

CPU L1 Cache : 32KB

CPU L2 Cache : 512KB

CPU Clock Speed : 1000MHz

Memory Type : DDR2 SDRAM

Memory Size : 1024MB

Memory Speed : 400MHz

BootWare Size : 4MB

Flash Size : 128MB

cfa0 Size : 247MB

NVRAM Size : 1024KB

BASIC CPLD Version : 003

EXTEND CPLD Version : 003

PCB Version : Ver.B

The switch initiates the power-on self-test (POST) and the results are displayed at the console terminal.

Board self testing...........................

Board steady testing... [ PASS ]

Advertising