Figure118 successful switch test results, Recover the problem with the gbic or the switch, A. recable the link between the hba and switch – Sun Microsystems 6900 User Manual

Page 173: Sun proprietary/confidential: internal use only

Advertising
background image

Chapter 11

Example of Fault Isolation

153

Sun Proprietary/Confidential: Internal Use Only

The first run failed, indicating a problem with either the GBIC or with the Sun
StorEdge network FC switch.

To further isolate the problem, a new GBIC was inserted into the port, the loopback
connector was re-inserted, and the same test was run a second time.

FIGURE 11-8

Successful Switch Test Results

On this pass, the test was successful. This indicates that the problem was most likely
the switch-side GBIC, which was replaced.

6. Recover the problem with the GBIC or the switch.

a. Recable the link between the HBA and switch.

b. Use the Sun StorEdge T3+ Array Failover Driver GUI for the Sun StorEdge 3900

series system, or the CLI for the 6900 series, to recover the multipathing.

Advertising
This manual is related to the following products: