To Isolate the A1 or B1 FC Link

To isolate the A1 or B1 link, which is the FC link from the HBA to the switch, follow
these steps:

1. Quiesce the I/O on the A1 or B1 FC link path.

2. Run

switchtest(1M)

or

qlctest(1M)

to test the entire link.

3. Break the connection by uncabling the link.

4. Insert a loopback connector into the switch port.

5. Rerun

switchtest

.

a. If

switchtest

fails, replace the gigabit interface converter (GBIC) and rerun

switchtest.

b. If

switchtest

fails again, replace the switch.

6. Insert a loopback connector into the HBA.

7. Run

qlctest

.

a. If the

qlctest

test fails, replace the HBA.

b. If the

qlctest

test passes, replace the cable.

8. Recable the entire link.

9. Run

switchtest

or

qlctest

to validate the fix.

10. Put the path back into production.