Rerun switchtest, B. if the test fails again, replace the switch, A. replace the cable – Sun Microsystems 6900 User Manual

Page 85: B. rerun switchtest, Return the path to production, Sun proprietary/confidential: internal use only

Advertising
background image

Chapter 5

Troubleshooting the Fibre Channel (FC) Links

65

Sun Proprietary/Confidential: Internal Use Only

5. Rerun

switchtest

.

a. If

switchtest

fails, replace the GBIC and rerun

switchtest

.

b. If the test fails again, replace the switch.

6. If

switchtest

passes, assume that the suspect components are the cable and the

Sun StorEdge T3+ array controller.

a. Replace the cable.

b. Rerun

switchtest

.

7. If the test fails again, replace the Sun StorEdge T3+ array controller.

8. Return the path to production.

9. Return the Sun StorEdge T3+ array LUNs to the correct controllers, if a failover

occurred. (Determine if failovers occur using the

luxadm failover

or

failbackt3path

commands.)

Advertising
This manual is related to the following products: