Sanyo CH4242 User Manual

Page 22

Advertising
background image

1

1

1

1

1

X

21

S4359146

(e) Installing the ceiling panel

Attach the ceiling panel to the chamber.

Drawing the panel downwards sets the panel in

position temporarily with the panel catch (at 2

locations).

Remove the socket cover of the air-intake plenum

and pass the 8P sockets through it. (Fix the panel

lead wire to chamber side clamper.) (Fig. 3-17)

Connect the 8P socket (electrical component box

side) to the 8P socket (ceiling panel side) of the

indoor unit electrical component box.

Reattach the socket cover.

Fig. 3-18

Ceiling panel

Panel catch

Installation screws

(M4

×

1/2 in.)

Duct
connection
flange

Duct connection box

1976_X_S

Advertising
This manual is related to the following products: