7-9. Electrical Wiring

Connection method
(1)

Connect W1 to the indoor PCB WL connector.

(2)

Connect W3 from the indicator section with W2
from the operating controller using the relay
connector.

7-10. Test Run Switch

Test run switch is located at operating control unit.

Regarding the test run, please refer to section 12. Test

Run.

In case of 4-way air discharge type, test run opera-

tion is not possible without the ceiling panel installa-

tion.

During the test run, all of the 3 indicator lamps on

the indoor unit will flash.

During the test run, the air conditioner runs continu-

ously and the thermostat does not control the

system.

To protect the air conditioner from overloading, the

outdoor unit will not start running for 3 minutes after

power is applied or the air conditioner is turned off

and then back on.

When the air conditioner fails to start the test run, 1

or more of the 3 alarm indicator lamps on the indoor

unit will flash (See next section).

Fig. 7-10

WHT

BLK

1
2

W1 (4.3 ft.)

WL

Indoor PCB

Operating controller

Signal receving unit

2035_M_I

Indicator section

W2

(0.7 ft.)

W3

(4.3 ft.)

CN1

CN2

Relay connector

CN1

BLU
YEL

PNK
RED

GRY

BLK

BLU
YEL

PNK
RED

GRY

BLK

NOTE

1

1

ADR

1.TEST RUN
2.PCB CHK.
3.RCU: MAIN
RCU: SUB
4.NORMAL
ALL •

Servicing
switches

Address
switch

ON/OFF
operation
button

1999_M_I

All OFF( ) for

initial settings.

2 3 4

2 3

4 5 6

Flap
button

Fig. 7-11