Maintenance, Maintenance -5 – Tyco 4100U User Manual

Page 149

Advertising
background image

11-5




The 4100U system must be kept free from faults and tested on a weekly, monthly and
annual basis to verify that it is operating correctly. The tests required by part 8 of the
standard AS1851 Maintenance of Fire Protection Equipment are detailed in the 4100U
Operator’s Manual, LT0351.

The Operator’s manual also provides detail of report printing and performing tests that are
useful for checking the system.

Maintenance

Advertising