Teledyne LeCroy Conquest User Manual - Users Manual User Manual

Page 174

Advertising
background image

Current Measurement (Optional)

164

To start test, click Run. This opens a reminder prompt to make sure that the
initial test setup is in place.

Click OK to continue the test. A flashing prompt asks you to connect the
Standard Load #2 to the Analyzer.

Once the Standard Load #2 has been connected the test proceeds to display
the measurement result.

Figure 125 VBus Droop Test Result

Advertising