Setting up power – Avaya Sun Fire V880 User Manual

Page 28

Advertising
background image

Installation

28 Avaya CMS Sun Fire V880 Computer Hardware Installation, Maintenance, and Troubleshooting

Setting up power

To set up the AC power:

1. Locate the key switch, insert the key, and turn the key switch to the Forced Off position.

See the following figure.

2. Connect the IEC 320 end of each power cord to the AC connector of each power

supply.

For installations outside of the United States and Canada, obtain three power cords for
your local configuration.

3. Route the power cord through the strain-relief tie-wrap loop located to the right of the

supply. Tighten the tie-wrap to secure the connection.

4. Plug the power cords from the computer using one of the following schemes:

Connect the computer using two (2) 2KVA Uninterruptible Power Supplies (UPS) (or
equivalent), each powered by a nonswitched, dedicated, 15-amp circuit. Connect
two of the power supplies to one UPS, and the third power supply to the second
UPS. The monitor and external peripherals can also be connected to the second
UPS.

If not using a UPS, each power supply should be connected to a nonswitched,
dedicated, 15-amp circuit. The monitor and external peripherals should be
connected to a separate circuit.

!

Important:

!

Important:

Important:

Do not turn on power at this time.

Advertising