Introduction, Tools required, Unpack and inspect the system – ADTRAN 600R User Manual

Page 38

Advertising
background image

Network Turnup Procedure

Total Access 600 Series System Manual

36

© 2004 ADTRAN, Inc.

61200624L1-1B

1.

INTRODUCTION

This section discusses Total Access 600 Series installation.

2.

TOOLS REQUIRED

The tools required for wallmount installation of the unit are:

Four #8 x 3/4 inch pan-head wood screws

Drill and drill bit set

Flat head screwdriver (medium)

Two Phillips head screwdrivers (small/medium)

Wire-wrap gun (optional)

25-pair male amphenol cable (customer connection)

Selected punch-down block and tool

3.

UNPACK AND INSPECT THE SYSTEM

Each unit is shipped in its own cardboard shipping carton. Open each carton carefully and avoid deep
penetration into the carton with sharp objects.

After unpacking the unit, inspect it for possible shipping damage. If the equipment has been damaged in
transit, immediately file a claim with the carrier, and then contact ADTRAN Customer Service (see
Customer Service, Product Support Information, and Training in the front of this manual).

To prevent electrical shock, do not install equipment in a wet location or during a
lightning storm.

During installation, power should be the last connection made.

Electronic equipment can be damaged by static electrical discharge. Before handling
modules, put on an antistatic discharge wrist strap to prevent damage to electronic
components. Place equipment in antistatic packing material when transporting or storing.
When working on equipment, always place it on an approved antistatic mat that is
electrically grounded.

Advertising
This manual is related to the following products:

604, 624, 612, 606, 616