Stratum 3 clock wiring installation procedure – Avaya 555-233-116 User Manual

Page 167

Advertising
background image

Set clock options

Issue 4 October 2002

167

555-233-116

Stratum 3 clock wiring installation procedure

1. Connect the B25A cables from the TN780 connector panel slot on the

system cabinet and the Stratum 3 Clock to the cross-connect module in the
yellow field.

2. Connect the CSU plug end of the H-600-274 Y-cable to the primary CSU.

Route an H600-307 cable from the DS1 connector panel slot on the system
cabinet to the connector on the “SYSTEM” end of the Y-cable.

3. Route a B25A cable from the “CLOCK” end of the Y-cable to the cross-

connect module in the yellow field.

4. Repeat steps 2 and 3 for the secondary CSU. The maximum allowable

cabling distance between the Stratum 3 clock and the CSU is shown in the
table below.

5. For standard reliability systems, refer to Y-cable to cross-connect the

TN780 and “CLOCK” end connections to the Stratum 3 clock connections
on the cross-connect module.

6. For high or critical reliability systems, refer to table below to cross-connect

the TN780 and “CLOCK” end connections to the Stratum 3 clock
connections on the cross-connect module.

Table 19.

Maximum cabling distance for different CSUs

Channel Service Unit (CSU)

Maximum Cabling Distance

551A

85 feet (27 m)

551V

85 feet (27 m)

551V EFS/R

755 feet (199.7 m)

EFS T1

755 feet (199.7 m)

Table 20.

Y-cable clock-end cross-connects for reliability

From Stratum 3 Clock

To Y-cable clock end
(primary)

To Y-cable clock end
(secondary)

Lead
Name

Lead Color/
Terminal

Lead
Name

Lead Color/
Terminal

Lead
Name

Lead Color/
Terminal

RREF1

W-BL/1

V-O/43

TREF1

BL-W/2

O-V/44

RREF2

W-O/3

V-O/43

TREF2

O-W/4

O-V/44

Advertising