Esm installation, Administration – Avaya 555-233-116 User Manual

Page 222

Advertising
background image

Multimedia communications products: MMCX, MMCH,
ESM

555-233-116

222

Issue 4 October 2002

Figure 62.

Typical multimedia call handling ESM connections

ESM installation

Use the following procedure and

Figure 62

to connect to the ESM equipment:

1. Install the TN2207 primary rate interface (PRI) circuit pack and the

TN787F/G/H/J/K multimedia interface (MMI) circuit pack in the port carrier.

2. Record the circuit pack locations.

3. Connect the ESM Y-cable as shown.

Administration

1. Enter list configuration all, and a list of the installed carriers, circuit

packs, and ports appears.

2. Record the location (board number) of the new circuit packs and verify that

all other required circuit packs (refer to

‘‘ESM installation’’

) are present.

3. Enter add DS1 xxxxx, (where xxxxx is the location of the TN2207 PRI

circuit pack recorded in step 2), and the DS1 circuit pack administration
form appears.

4. Set the

Name:

field to ESM DS1

5. Set the

Bit Rate:

field to 2.048

6. Set the

Line Coding:

field to hdb3

7. Set the

Signaling Mode:

field to isdn-pri

8. Set the

Connect:

field to pbx

1. Port B Y-cable connector to a TN787

multimedia interface (MMI) circuit pack

2. Port A Y-cable connector to a TN2207 PRI

circuit pack

3. 25-pair Y-cable
4. 357A adapter

5. D8W cord connected to 357A adapter

S/B port 8

6. Expansion service module (ESM)
7. Port B on compatible primary rate

interface (PRI) card

Advertising