Product change, 1 product change specifications, Chapter 11: product change – Banner PresencePLUS P4 COLOR Series User Manual

Page 349: Chapter 11 product change

Advertising
background image

Chapter 11

Product Change

This section explains the Product Change (pin 3) input.

The Product Change input is used in conjunction with one of the four I/O points programmed as Product Select lines.
The inspection loaded will be executed following a valid trigger.

• The Product Change input responds to the leading edge transition of a pulse greater than 1 millisecond.
• The Product Select input is pulsed to correspond to a program location. For example, five pulses will load program

#5.

11.1 Product Change Specifications

Current Sourcing (PNP)

Current Sinking (NPN)

State

> 8V at -7.5 mA max.

< 2V at 1 mA max.

ON

< 2V at -7.5 mA max.

> 10 V at 4 mA max.

OFF

One of the four I/O on the System Setup InputOutput tab must be programmed for Product Select if Product Change
is to be used.

349

Minneapolis, MN USA

Banner Engineering Corp.

Advertising
This manual is related to the following products: