4 scale base installation – Rice Lake CLS-420 Cargo Lift Scale Installation Manual User Manual

Page 14

Advertising
background image

9

CLS-420 Installation Manual

2.4

Scale Base Installation

The scale and indicator are shipped in an upright position as illustrated in Figure

2-2 and are enclosed in a

protective wood cover. The upright position allows for ease of installation, especially if one person is installing the
scale.

Protective wood
covering

Metal banding

Steel shipping pallet

Protective wood
enclosure for
indicator

Step 1: Clip
metal bands

Figure 2-2. Scale Component Parts on Shipping Pallet

Use the following steps to install the scale base to the fork lift.

1. Clip the three metal bands that are encircling the scale and component box on the backside of the pallet

(shown in Figure

2-2) and also remove the protective wood pieces which protect the sides of the scale.

2. Remove the wooden cover containing the indicator. It should be noted that there are two screws holding

the indicator to the shipping pallet. Back those two screws out to remove the indicator.

3. Loosen the bolts from the scale carriage assembly and back them out using a 3/4" socket wrench. The nuts

holding the bolts on the backside of the scale are welded onto the scale which requires the use of only one
socket wrench. This is what holds the scale in an upright position.

Step 3: Back out
anchoring bolts using
3/4" socket wrench
and discard the bolts

Step 4: Remove front
portion of the steel
pallet

Figure 2-3. Bolt Location on Pallet

4. Remove the front portion of the steel pallet that the scale is sitting on. It will break away from the rest of

the pallet.

Advertising