3

2.0

Installation

This section describes procedures for connecting load
cell, analog output, power, and serial communications
cables to the

iQUBE

junction box.

Assembly

drawings and replacement parts lists for the

iQUBE

are included for the service technician.

Use a wrist strap to ground yourself and
protect components from electrostatic
discharge (ESD) when working inside the

iQUBE

enclosure.

2.1

Unpacking and Assembly

Immediately after unpacking, visually inspect the

iQUBE

to ensure all components are included and

undamaged. The shipping carton should contain the

iQUBE

, this manual, and a parts kit. If any parts were

damaged in shipment, notify Rice Lake Weighing
Systems and the shipper immediately.

See Section 2.16 on page 16 for parts kit contents.

2.2

Mounting the Enclosure

The

iQUBE

can be mounted either vertically or

horizontally to a flat surface.

2.3

Cable Connections

All models of the

iQUBE

provide ten cord grips for

cabling into the unit, plus a dedicated cord grip for a
ground wire. Up to eight load cells can be cabled into
the

iQUBE

; other cord grips allow cabling for serial

communications, analog output, digital I/O, and AC
power. Install plugs in all unused cord grips to prevent
moisture from entering the enclosure.

2.4

Load Cells

When wiring load cells, cells wired to

iQUBE

connectors J12–J19 (8-channel units) are assigned
default names A1–A8 (8-channel primary unit) or
B1–B8 (8-channel secondary unit). Be aware that
graphic representations of the weighing platform
shown when configuring the scale assume particular
locations for each load cell, based on the

iQUBE

connector used (see Table 2-1). Load cells can be
renamed during configuration.

Figure 2-1 shows two examples of load cell naming
for eight-cell platforms. While load cells can be wired
to any connector on the

iQUBE

connector board,

p l at f o r m s d e f i n e d a s u s i n g “ p a i r e d ” s e c t i o n s
(including most truck scale applications) must
correctly associate these pairs to ensure valid
calibration and diagnostic functions.

In the top example of Figure 2-1, the even/odd load
cell wiring scheme requires cells A1/A2, A3/A4, A5/
A6, and A7/A8 to be associated as section pairs. In the
lower example, the sequential wiring requires pair
associations for A1/A8, A2/A7, A3/A6, and A4/A5.
Pair association is set in the platform configuration for
the scale.

Figure 2-1. Load Cell Pairing for Eight-Cell Platforms

Channels 1–4

Channels 5–8

(8-channel units only)

iQUBE

Connector

Cell Name

iQUBE

Connector

Cell Name

J12

A1

J16

A5

J13

A2

J17

A6

J14

A3

J18

A7

J15

A4

J19

A8

NOTE: For secondary

iQUBE

units, the A prefix is replaced

with B, C, or D.

Table 2-1.

iQUBE Connector and Load Cell Names

A1

A2

A3

A4

A8

A7

A6

A5