Etanorm sya, Index – B&C Technologies IM Series Industrial Ironer User Manual
Page 102
Etanorm SYA
3
Index
Section Page
Accessories
4.6
6
Admissible ambient temperature
7.2.1
11
Aligning the Pump/Drive
5.3.1
7
Auxiliary connections
5.4.1
9
Bearing temperature
7.2.1
11
Checking the direction of rotation
5.7.3
9
Commissioning
6.1
9
Commissioning, start-up
6
9
Connecting the piping
5.4
8
Connection to power supply
5.7
9
Contact guard
5.6
9
Deep-groove ball bearing
7.2.2.3
11
Density of the medium handled
6.2.5
10
Description of the product and accessories
4
5
Design details
4.3
5
Designation
4.2
5
Diametral clearances
7.5.1
12
Dismantling
7.4
12
Disposal
7.3
11
Drainage
7.3
11
Exploded view, Etanorm SYA, SU 25
9.2
19
Exploded view, Etanorm SYA, SU 35, 55
9.4
21
Final check
5.5
9
General
1
4
General drawing, Etanorm SYA, SU 25
9.1
18
General drawing, Etanorm SYA, SU 35, 55
9.3
20
Grease change
7.2.2.2
11
Grease quality
7.2.2.2
11
Inspection
7.2
11
Installation at site
5
7
Installing the pump/unit
5.3
7
Interchangeability of pump components
7.6.1
15
Interim storage
3.2
5
List of components, Etanorm SYA, SU 25
9.1/9.2 18/19
List of components, Etanorm SYA, SU 35, 55
9.3/9.4 20/21
Lubricant change
7.2.2
11
Lubricant quantity
7.2.2
11
Lubricants
6.1.1
9
Maintenance
7.2
11
Measures to be taken for prolonged shutdown 6.3.2
10
Mechanical seal
7.4.4
12
Minimum flow
6.2.3
10
Minimum speed
6.2.4
10
Motor connection
5.7.1
9
Noise characteristics
4.5
6
Non-compliance with safety instructions
2.3
4
Operating limits
6.2
10
Ordering spare parts
7.6.2
16
Permissible forces and moments at the pump
nozzles
4.4
6
Personnel qualification and training
2.2
4
Place of installation
5.3.2
8
Plain bearing
7.5.1
12
Preservation
3.2/6.3
5/10
Priming the pump and checks to be carried
out
6.1.3
9
PTC-resistor connection
5.7.1
9
Section Page
Reassembly
7.5
12
Recommended spare parts stock
7.6.3
16
Related documents
9
18
Repair
7
11
Returning to service after storage
6.4
10
Safety
2
4
Safety awareness
2.4
4
Safety instructions for maintenance, inspection
and installation work
2.6
4
Safety instructions for the operator/user
2.5
4
Safety regulations, installation
5.1
7
Shaft seal
6.1.2
9
Shutdown
6.1.5
10
Shutdown/storage/preservation
6.3
10
Start-up
6.1.4
10
Storage
6.3.1
10
Supervision of operation
7.2.1
11
Switching frequency
6.2.2
10
Temperature of medium handled
6.2.1
10
Tightening torques
7.5.3
14
Time relay
5.7.2
9
Transport
3
5
Trouble-shooting
8
17
Unauthorized modes of operation
2.8
5
Unauthorized modification and manufacture
of spare parts
2.7
5
92